The LADOTD awarded this contract to C.E.C., Inc. (C.E.C.) for major rehabilitation of the I-20 Mississippi River Bridge at Vicksburg. The LADOTD determined that the structure’s main span had shortened due to rotation of one river pier. Due to the pier movement, C.E.C. was required to make modificati
Contracted by LADOTD to repair the I-10 Mississippi River Bridge in Baton Rouge, C.E.C., Inc. (C.E.C.) implemented a plan to retrofit false chord joints and associated expansion dams and to repair critical cracks and floor beams. The LADOTD determined that the structure’s main span had shortened due
Contracted by LADOTD, C.E.C., Inc. was tasked with the replacement of joints without compromising continual flow of traffic or the structure’s support. The project included: Remove existing joints Break out concrete around the existing joints Cut rebar as necessary and remove the joint from the rece
CEC,INC - Copyright © 2014.