Contracted by LADOTD, C.E.C., Inc. was tasked with the replacement of joints without compromising continual flow of traffic or the structure’s support.
The project included:
The existing joint was removed in sections, while managing to install the new MBJS’s (modular bridge joint system).
CEC,INC - Copyright © 2014.